15th & Utica
Tulsa, Oklahoma

This project involved widening East 15th Street and South Utica Avenue from an existing 4-lane to 5-lane to add left turn bays in all four directions. The location was a difficult area to improve because of the existing right-of-way not being sufficient to allow for the proposed street widening and many of the existing buildings encroaching on the standard right-of-way for this type of improvement. The utility relocation's were also challenging. BKL was responsible for grading, drainage, vertical/horizontal alignment, paving, storm sewer, waterline relocation, construction sequencing and right-of-way acquisition.